Construction route
Airport pavement application reference from Guangzhou Baiyun Airport.
2024-07-24
Construction route
Route introduction
The T3 rail transit hub station is 1,486 meters long, up to 160 meters wide and up to 25 meters deep. The foundation pit covers 142,300 square meters, equivalent to the combined area of 20 football fields, and is known in China as a "super foundation pit".
Construction status
Solutions
Start from the project scene, then move into the right robot, software workflow, training support and delivery plan.
Airport pavement layout combines autonomous driving, positioning and robotics to support measurement, marking and line drawing during airport road construction.
Sensor-based road inspection for pavement checks, field records and cloud report generation.
BIM and CAD based construction layout for accurate jobsite marking across building and infrastructure projects.
Related products
Browse pre-marking, road marking, layout, roadbed measurement, road inspection, construction automation and smart kit series with clear positioning, application scenes and inquiry paths.
Product center
Inspection robot for roadbed and pavement quality checks, data collection and cloud reporting.
Product center
Robot for BIM/CAD-based construction layout, point extraction and accurate onsite marking.
Contact
Use email, phone, WhatsApp or QR codes to reach the Roadiant sales team.